Change order of garage and lock screens on IQ4?

I just added a couple of Schlage locks to my IQ4 panel, which moved the garage door screen to 3rd (panel status → door locks → garage door). Is there a way to rearrange the swipe order?

There isn’t a way to change the order of the various pages (lights, locks, garage, etc.) We have made this request to Qolsys as a desired update as it is pretty common. Unfortunately, I do not know if this is something that is being worked on or not.

If it does it would be made available through Firmware updates. You can find firmware patch notes and update instructions via the below guide.